The National High Speed Rail Corporation Limited has finished placing all 13 heavy portal beams in Ahmedabad for the Mumbai-Ahmedabad high-speed rail line. This step advances construction on the 508-kilometre corridor. The Ministry of Railways aims to open the initial 47-kilometre section between Surat and Bilimora by August 2027. In Ahmedabad the 18-kilometre viaduct crosses several existing railway lines at height, requiring the portal beams for structural support.

Credit:
https://indianexpress.com/article/india/indias-first-bullet-train-project-mumbai-13-heavy-portal-beams-ahmedabad-nhsrcl-10780741/
BCN