The National High Speed Rail Corporation Limited has finished placing all 13 heavy portal beams in Ahmedabad for the Mumbai-Ahmedabad high-speed rail line. This step advances construction on the 508-kilometre corridor. The Ministry of Railways aims to open the initial 47-kilometre section between Surat and Bilimora by August 2027. In Ahmedabad the 18-kilometre viaduct crosses several existing railway lines at height, requiring the portal beams for structural support.
Breaking
- Vijay Distributes Job Letters to Karur Stampede Victims’ Families
- Dr. Reddy’s Suspends Semaglutide Supplies Over Quality Issue, Shares Fall
- Live-Action Moana Remake Stars Dwayne Johnson in Faithful but Uninspired Adaptation
- EU Accuses Instagram and Facebook of Breaking Digital Rules
- Finance ministry calls lenders for meeting on 13 July to review, step up foreign currency mobilization
- Mouse Study Links Virus to Parkinson’s-Like Neuronal Loss


